Hugh L. Carey Tunnel

Flooding from Superstorm Sandy compromised the fire line in the Hugh L. Carey Tunnel. To reach the old line, JPH is using a custom-built wall saw to cut through the concrete.

This would have been impossible years ago, but JPH’s hydraulic, electric and pneumatic powered saws can do the job with ease.

Related Projects